The Solon Springs Wastewater Treatment Plant consisted of expanding and constructing three new treatment ponds while maintaining the existing treatment process.
Owner: Village of Solon Springs, WI
Engineer: Ayres Associates
Contract Amount: $2.6 Million
Completion: September, 2012
Major Work Items:
320,000 C.Y. of earthwork
1,300,000 S.F. of PVC Liner and Geotextile Fabric
8,000 C.Y. of riprap
2,700 L.F. of buried piping and 6,200 L.F. of force main.
As well as earthwork and piping there are several large structures including equipment and controls to effectively operate and monitor the plant.
WisDOT is reconstructing approximately one mile of Tower Avenue (WIS 35) in the city of Superior – Douglas County, from Belknap to North 3rd Street. Tower Avenue (WIS 35), is a principal artery on the National Highway System. This long truck route connects to I-535, US 53 and US 2. This project will provide safe and efficient roadway to the motoring public, local traffic and pedestrians. The highway has not been reconstructed since 1935.
Owner/Engineer: Wisconsin DOT
Prime Contract Amount: $14 Million (Chippewa Concrete)
McCabe Contract Amount: $5 Million
Completion: October, 2013
Major Work Items:
70,000 S.Y. of concrete removal
70,000 C.Y. of excavation
Hauling and disposing of any contaminated soil
Removing 3,000 L.F. of storm sewer
Installing 10,000 L.F. of storm sewer from 12 inch to 60 inch
Removing and installing 10,000 L.F. of water main and sanitary sewer
Installing 4,000 L.F. of water service while maintain temporary water to all residences and businesses
Bullis Farm Road is a commercial development in Eau Claire, WI near the I94 and STH53 interchange.
Owner: Oakwood Business Park, LLC
Engineer: Ayres Associates
Contract Amount: $1.5 Million
Completion: October, 2011
Major Work Items:
25 Acres of clearing and grubbing
100,000 C.Y. of excavation
3,000 L.F. of water main and services
3,000 L.F. of sanitary sewer and services
4,000 L.F. of storm sewer construction and inlets
The preparation of roadway subgrade, base course, asphaltic concrete pavement, concrete curb and gutter, concrete sidewalk, street lighting, and lawn replacement.
Bush Brothers and Company has been in the process of a $60 million expansion since 2009. We have played an integral part in that expansion and continue to be an ongoing partner. We have performed $6 million in various projects including site work excavation, all ancillary water and sewer connections and structures, excavation and backfilling of various building construction projects, building demolition, and parking lot construction.
We work closely with Bush Brothers and Company, the Engineers, and countless other contractors to continue the success of the expansion. We play a major role in their design build projects, offering time and money saving ideas through innovative construction techniques and design changes.
W.R. Davies Student Center is a 170,000 square foot building on the campus of UW Eau Claire. McCabe Construction Inc. was part of a large team of contractors completing the project on time and within budget.
Owner: University of Wisconsin – Eau Claire
Prime Contract Amount: $49 Million (Kraemer Brothers)
McCabe Contract Amount: $1.6 Million
Completion: August, 2012
Major Work Items:
Earthmoving including a 2’ subcut for the entire building and backfilling with structural backfill.
Roadway Subgrade Preparation
Trenching and Backfilling
Dewatering
Erosion Control
Hard Surface Base
Bioretention Devices
Soil Preparation
Utility Horizontal Directional Drilling
Water Utility Distribution Piping
Sanitary Sewerage, Storm Drainage, and Chilled Water Utilities